Dear Experts,
Grateful if you could help to solve our following WIP processing steps with problem -
1) Executed KKAQ for a Plant with period 05 2014 and selected "All RA Versions"; 3 checkboxes below the "Plant" were checked. After execution, found "WIP (Cumul.) $269,595.10" with a system msg - "120 objects processed. Error occurred on 0 objects".
2) Executed KKS1 for a Plant with period 05 2014 and selected "All target cost vsns"; 3 checkboxes below the "Plant" were checked. After execution, found Result - "Processing completed with no errors", though there were 15 error msgs. - "System status CLSD is active (ORD ........) for 15 Prod. Orders, there was no WIP (cumul.) value for these Prod. Orders as checked in KKAQ.
3) Executed CO88 for a Plant with period 05 2014; Processing type = "1 Automatic"; The 1st 4 checkboxes below the "Plant" were checked; "Detail List" was also checked under "Processing Options". After execution, found "No Change = 83" & "Inappropriate status = 37" under the "Processing catogory".
4) Finally the WIP(Cumul.) $269,595.10 could NOT be found for the specified GL A/C 13802001 of the above Co. Code (Plant) when executing our customised "Trial Balance Report - ZFIGLR011", whlie there was no problem for the GL A/C of our another Co. Code (Plant) with the same steps as above.
Could you advise how to check & solve this problem ? Pls also let me know if you need more info. on this.
Many Thanks,
KH Fong