Hi all,
in my scenario we are implementing the WM-PP interface.
Following the planned steps:
- Production Order release (CO01/02)
- Production Supply preparation (LP10/COHV)
- TR conversion into TO (LB10/LT04)
- Manual confirm of TO (LT22/LT23)
Is possible, via standard SAP, to:
- automate the TR conversion into TO (maybe scheduling a job?)
- link to the TO confirmation the MM-261 posting
Thanks in advance!